Intermittent Bonded Ribbon Production Line For Sale
A specified speed of 600 m/min gives this equipment considerable production capacity for optical-fiber applications. Prospective buyers should confirm the achievable speed, machine setup, and required operating conditions directly with the manufacturer before proceeding.
Shanghai Weiye OFC provides a system engineered to manufacture 12- and 16-fiber rollable ribbons. Its product description presents the equipment’s capabilities, technical specifications, and included systems, providing U.S. buyers with a basis for comparing their equipment requirements.
Review the listed configuration in the product description, then contact the supplier about pricing, installation, and options specific to your project. This approach helps determine which equipment details apply to your particular manufacturing site and goals.
Shanghai Weiye Optic Fiber Communication Equipment Co., Ltd. provides its business address as 201 Minyi Road, Songjiang District, Shanghai. Use the product page for initial reference and verify current technical and commercial information directly with the company. A detailed quotation request can help advance your equipment evaluation.
Fiber Draw Tower Fiber Draw Tower SZ Stranding Line
Key Takeaways
- A speed of 600 m/min is listed, but buyers should verify the operating conditions with the manufacturer.
- This equipment supports production of 12-fiber and 16-fiber rollable ribbon formats.
- The product listing describes machine capabilities, technical specifications, and supplied systems.
- Request details about pricing, installation requirements, and project-specific customization.
- The supplier provides a business address in Songjiang District, Shanghai.
Overview Of The Intermittent Bonded Ribbon Production Line
The manufacturer identifies this machinery as suitable for 12- and 16-fiber rollable IBR formats. Its product page specifies a construction speed of 600 m/min and a fiber diameter of Ф245 μm ±10 μm. As these are manufacturer-listed values, confirm the actual production speed and relevant operating requirements directly with the supplier.
Intermittent Bonded Ribbon Production Line
Equipment Designed For Twelve- And Sixteen-Fiber Rollable Ribbon Production
Two fiber-count options are supported by the configuration for manufacturing rollable ribbons. This provides a useful reference when buyers compare machinery against their required ribbon format, fiber dimensions, and material-handling arrangements.
How Intermittent Adhesive Bonding Allows Flexible Fiber Configurations
The patent’s design examples describe neighboring fiber subunits joined by adhesive bonds positioned at intervals. The patent provides an example of adhesive-bond intervals ranging between 10 mm and 1,000 mm. This differs from a continuously bonded structure in which the connection extends across the full ribbon length.
By spacing the bonds apart, the assembly can move between a mostly planar arrangement and a rolled, curled, or folded shape. These bond-spacing figures describe examples of the design approach and should not be interpreted as stated equipment settings.
- Machine details: A choice of 12 or 16 fibers, a listed operating speed of 600 m/min, and a specified diameter of Ф245 μm ±10 μm.
- Patent example: Adhesive-bond intervals ranging from 10 mm to 1,000 mm.
- Design benefit: Flexible handling across several possible shapes.
Uses In Optical Fiber Cable Manufacturing
Adjustable fiber layouts may allow cable designers to combine convenient splice access with space-efficient packaging. The patent outlines a configuration that maintains fiber organization while allowing portions to move between adhesive connection points during cable assembly.
Compact Cable Designs And High Fiber Density
An optical fiber ribbon may remain flat during mass fusion splicing and subsequently fold or roll for installation in a smaller cable. The patent identifies opportunities for reduced cable dimensions and a greater proportion of fiber area relative to the cable’s cross-sectional area. The results achieved in practice depend on the complete cable construction and its intended use.
Ribbon Organization For Efficient Fusion Splicing
The ribbon format enables organized handling at the splice location while allowing the subunits to move during cable assembly. The manufacturer’s material-handling specifications identify payoff reel capacities of 25.2 km and 50.4 km of fiber. These reel capacities can be compared with the facility’s cable-manufacturing needs and material-handling setup.
| Design detail | Potential use | Buyer consideration |
|---|---|---|
| Flat fiber configuration | Fusion splicing of multiple fibers | Verify the needs of your splicing process |
| Folded or rolled format | Compact cable packaging | Examine the complete cable design |
| Payoff reels with capacities of 25.2 km and 50.4 km | Material-handling preparation | Align reel capacities with operating needs |
Specifications And Performance Of The Production Line
Compare the equipment’s published performance figures with your manufacturing requirements before requesting a quotation. Installation preparations should also account for suitable reels and the utilities available at the production site.
Speed, Diameter, And Attenuation
The stated construction speed is 600 m/min. The specified fiber diameter is Ф245 μm ±10 μm, while additional attenuation is stated as ≤0.01 dB/km at 1550 nm. Confirm the measurement conditions and expected performance directly with the manufacturer.
Payoff And Take-Up Reel Compatibility
Two payoff reel sizes are offered, with each full reel limited to 10 kg. For take-up, the equipment accepts either a T-type reel or a fiber-optic reel. Verify that your selected reel configuration is compatible with the facility’s material-handling process.
Facility Utilities And Operating Environment
The machine requires a three-phase, five-wire electrical supply rated at 380 V ±10%. Its specified operating environment is enclosed, clean, dry, and protected from drafts, with temperatures of 15 to 25°C and relative humidity no higher than 85%. Nitrogen must be supplied at 7 bar with 99.99% purity, together with compressed air at 6 bar. Verify the required utility connections before installation begins.
| Specification | Listed requirement | Planning note |
|---|---|---|
| Payoff reels | Ф236 × Ф25.4 × 108 mm; Ф267 × Ф25.4 × 180 mm; maximum full-reel weight ≤10 kg | Check reel compatibility and maximum weight |
| Take-up reel | T-type dimensions of Φ410 × Φ50.8 × 391 mm, or a fiber-optic reel | Confirm compatibility with your selected format |
| Power and environment | Power supply of 380 V ±10%; temperature of 15 to 25°C; humidity ≤85% | Prepare a dry, clean, draft-free operating area |
| Gas utility supply | Nitrogen: 7 bar, 99.99% purity; air: 6 bar | Verify gas supply capacity before installation |
Fiber Payoff And Gathering Equipment
Optical fibers are guided toward the forming section by the payoff and gathering components. Their control systems support consistent feeding and help protect individual fibers throughout handling.
Sixteen-Spool Payoff With Tension Control
The payoff assembly holds 16 spools and provides traversing along with separately adjustable tension settings. The permitted weight for an individual spool is up to 10 kg. The technical details list 0.4 to 2 N tension with ±0.02 N accuracy, together with a 550 W motor. Because a separate overview states 40 to 150 g with ±2 g accuracy, ask the manufacturer to clarify the correct values for your intended setup.
Fiber Guidance, Break Detection, And Static Control
U-groove guides, multi-groove gathering rollers, and anti-jump components channel fibers into the forming section. Operators receive alerts about fiber problems through break detection and alarm functions. Safe handling is supported by protective guards and a pneumatic clamping mechanism. At the fiber exit, a rod-style electrostatic dust collector is installed, while anti-static equipment helps manage dust along the gathering route.
| Component | Listed detail | Purpose |
|---|---|---|
| Payoff | Capacity for 16 spools, each weighing up to 10 kg | Feeds optical fibers with traversing movement |
| Tension and motor | 0.4 to 2 N with ±0.02 N accuracy; 550 W | Supports regulated payoff of fibers |
| Guidance and safety | Grooved rollers, alarms, guards, and pneumatic clamping | Guides fiber movement and assists material handling |
| Electrostatic management | Rod-type dust collector and anti-static equipment | Helps reduce dust near fiber routes |
Intermittent Adhesive Dispensing And Precision Molding
Operators can adjust adhesive positioning and mold alignment through the forming platform. Available adjustments help configure the process for each required ribbon format.
Adjustable IBR Mold Platform For Ribbon Formation
Ribbon formation uses three mold assemblies, each capable of holding up to five Nordson EFD jet valves. Operators can position the mold within 0 to 15 mm and adjust its base temperature from 20°C to 60°C. Precision valve groups mounted on sliding tables allow fine positioning and accurate application of adhesive dots.
Configurable Nozzle Arrangements For Twelve- And Sixteen-Fiber Ribbons
The 12-fiber configuration employs a 5+5+1 valve arrangement. The 16-fiber format is produced using a 5+5+5 valve layout. Operators can adjust adhesive-dot spacing and the number of dots through the interface to match the selected optical fiber ribbon design. A dedicated adhesive is required for the coating and curing stages.
| Setting | 12-Fiber Format | 16-Fiber Format |
|---|---|---|
| Valve arrangement | 5+5+1 valve configuration | Valve arrangement of 5+5+5 |
| Mold adjustment | Adjustment range of 0 to 15 mm | Adjustment range of 0 to 15 mm |
| Mold-base temperature | Temperature range of 20°C to 60°C | 20°C to 60°C operating range |
Curing Bonded Fiber Ribbons With UV-LED Technology
Adhesive across the fiber assembly is cured through a sequence of UV exposure stages. Prospective buyers can assess the oven configuration and listed operating specifications to determine whether the equipment suits their production process.
Initial Pre-Curing And Main Curing Operations
Three dedicated LED-UV ovens rated at 800 W each perform the pre-curing operation. Each oven processes fibers supplied by a separate mold group before the material reaches the main 6 kW post-curing oven. The system uses adjustable shutters to help contain UV exposure and minimize nitrogen losses. Published specifications identify a dominant wavelength of 395 nm ±3 nm, a curing degree of at least 85%, and post-curing power of at least 2.5 kW.
Nitrogen Management And Curing Performance
Operators can manually regulate nitrogen pressure and flow. Automatic functions also start nitrogen delivery during startup and stop it at shutdown. The manufacturer states that lamp-array power use remains at or below 80% of total power during steady, continuous operation at production speed. The figures are useful for initial equipment assessment, but buyers should confirm the conditions under which they were measured. Ask whether different adhesives or materials require adjustments to the settings.
Visual Monitoring, Capstan, And Take-Up
Visual inspection and consistent winding help preserve fiber quality as material passes through the production line. Buyers can use the listed specifications to assess whether the machine meets the demands of their cable manufacturing process.
Online Inspection Of Fiber Color Sequence And Adhesive Dots
Real-time magnified views are displayed through the machine’s microscope and camera system. Operators can inspect optical-fiber color order and verify the presence of resin dots at individual dispensing locations. By examining the optical fiber ribbon during production, operators can detect potential issues ahead of winding.
Precision Take-Up With Servo-Controlled Traction
A 1 kW AC servo motor powers the capstan’s Φ190 mm traction wheel. Metering accuracy is specified as better than 1‰. Operators can set tension between 50 and 500 g while maintaining an accuracy of ±5 g. These operating parameters help maintain careful fiber-ribbon handling as the material advances through the line.
Take-up operation is rated at 600 m/min with a spool weight limit of 30 kg. The servo-driven take-up and traversing assemblies support uniform positioning during winding. Cable pitch can be adjusted continuously between 1 and 6 mm. Position detection and direction changes are supported by a photoelectric sensor. Check the intended cable requirements and actual operating conditions with the manufacturer.
Electrical Controls And Production Monitoring
Accessible controls allow operators to adjust settings, check equipment status, and arrange orderly shutdowns. The supplier identifies Siemens control equipment and Schneider Electric switchgear as components of the production line.
PLC And Touchscreen Operation
Siemens S7-1200 and S7-1500 PLCs manage the ribbon manufacturing system through a 10.4-inch Siemens touchscreen. Schneider Electric provides the low-voltage switching equipment. The system supports both interlocked operation across the full production line and separate operation of individual units.
Settings, Alarms, And Length-Based Stops
Through the touchscreen, operators can manage process settings, activate curing ovens, configure wire feeding, and view alarms. It also displays lamp operating hours, live lamp current, oven temperature, and the equipment’s accumulated operating time. The meter-counter calibration feature allows displayed counts to be aligned with the distance actually traveled.
A preset length can be entered to initiate slowing or stopping of the machine. The function supports managed stopping as a cable manufacturing run reaches its planned length. Ask the manufacturer to confirm control capabilities and setup requirements before placing an order.
| Control feature | Listed detail | Use |
|---|---|---|
| PLC controls and operator display | Siemens S7-1200/S7-1500; 10.4-inch touchscreen | Configure settings and examine production data |
| Electrical components | Low-voltage switchgear from Schneider Electric | Supports electrical control operations |
| Monitoring and stopping | Lamp, oven, runtime, and meter information with preset length | Monitor production and stop or decelerate the equipment |
Ribbon Quality, Material Selection, And Process Compatibility
The selected adhesive influences coating uniformity and the quality of the finished ribbon. Rather than recommending a general adhesive, the supplier specifies a formulation dedicated to the equipment’s coating and curing operations.
Dedicated Adhesive For Bonding And Curing
The pressure-fed adhesive system provides independent valve switches so each supply path can be opened or closed as required. Adhesive flow to each dispensing point is managed using precision pressure-control valves. The specified air pressure is adjustable, with a required minimum of 0.5 MPa.
Black adhesive supply tubing helps protect the material from reactions caused by UV exposure during operation and curing. This protection is important because premature exposure may change adhesive properties before application to the fiber.
Before selecting materials for a secondary coating line, verify adhesive compatibility, production settings, and required surface-quality standards with the supplier. Ask how the recommended adhesive performs under your intended application conditions and expected production length. Detailed manufacturing guidance can support consistent quality throughout setup and the completed run.
Installation Requirements And Included Documentation
Ensure the workspace and utility supplies are ready before scheduling the machine’s installation. The manufacturer’s stated requirements help buyers prepare their facilities and maintain stable operation of the optical fiber equipment.
Facility Conditions And Buyer-Supplied Connections
Install the machinery in a clean, dry, enclosed environment protected from drafts. Maintain a room temperature of 15 to 25°C and relative humidity no higher than 85%. Provide nitrogen at 7 bar and 99.99% purity, along with compressed air at 6 bar.
The equipment package does not include connecting cables or cable trays. The buyer must arrange the principal power feed-in cable. Verify the available utilities and planned cable routes ahead of setup, especially if a secondary coating section is nearby.
Documentation For Operation, Installation, And Maintenance
The supplier includes documentation supporting machine installation, operation, and servicing. Inspect the supplied documentation before commissioning so personnel can organize tasks and obtain required materials.
- Instruction manuals, operating guides, and a general layout drawing
- Wiring and electrical schematic diagrams, plus installation and maintenance drawings
- Manuals for purchased parts and a list of wear parts for maintenance planning
The supplied records support preparation for commissioning and routine servicing of the cable production machinery.
Choosing A Ribbon Production Line For Your Manufacturing Needs
Begin by identifying the ribbon formats you intend to manufacture and sell. This production line is designed for 12F and 16F options, with a listed construction rate of 600 m/min. Assess the stated capabilities against your planned range of products, throughput requirements, and projected cable orders.
Before purchasing the machine, confirm that its take-up arrangement matches your requirements. A standard IBR reel measures Φ410 × Φ50.8 × 390 × Φ310 mm, accommodates a maximum weight of 30 kg, and allows cable pitch settings between 1 and 6 mm. Check that these specifications suit your production facility and material-handling operations.
The compatibility of payoff spools should be reviewed as well. Available options include international-standard spools accommodating 25.2 km, 50.4 km, and 63 km. Request precise reel measurements before selecting materials or determining production run lengths.
In addition to speed, consider power and gas utilities, suitable adhesives, and the available monitoring functions. Assess whether the equipment arrangement is appropriate for fiber cable, loose tube, or the specific application in your cable production process. Discuss machine configuration and commissioning arrangements with Shanghai Weiye before committing to the purchase. A thorough compatibility assessment can help prevent expensive modifications later.
| Planning point | Listed detail | Buyer check |
|---|---|---|
| Formats and speed | 12F and 16F formats; 600 m/min | Match the specifications to manufacturing goals and product range |
| Take-up | Maximum 30 kg; cable pitch of 1 to 6 mm | Check reel compatibility and facility requirements |
| Fiber payoff reel options | 25.2 km, 50.4 km, and 63 km spool capacities | Confirm the precise reel measurements |
How To Request A Quotation For The Intermittent Bonded Ribbon Production Line
For U.S. manufacturers, the equipment provides 12F and 16F configurations, a listed construction speed of 600 m/min, and dedicated machinery for forming optical fiber ribbons. Compare these features with your planned cable products to assess equipment suitability.
A pricing inquiry should include your chosen format, projected production quantity, reel requirements, and facility utility details. Also describe the fiber type and handling requirements so Shanghai Weiye can evaluate the proposed configuration.
Before ordering, verify adhesive compatibility, the specified LED wavelength of 395 nm ±3 nm, and the published curing performance. Ask the supplier how these parameters relate to the chosen materials and required surface quality.
Consult the product page for the published equipment description. Contact Shanghai Weiye Optic Fiber Communication Equipment Co., Ltd. to confirm machine configuration, delivery arrangements, and commissioning requirements. The company’s listed address is 201 Minyi Road, Songjiang District, Shanghai. Telephone 021-60701630 to discuss your manufacturing requirements. A detailed quotation inquiry helps define the next steps in purchasing.